PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued grouting base plates Pic -1 (800x600).jpg Continued grouting base plates Pic -2 (800x600).jpg Excavation for a manhole at Rahway Ave. Facing South side of the Court Building (800x600).jpg Excavation in front of the Court Building (South Side) (800x600).jpg Installing the underground Tele-Data piping at Rahway Ave. Facing South side of the Court Building (800x600).jpg Installing the underground Tele-Data piping at Rahway Ave. in front of the New Court Building (800x600).jpg Compacting along column line 1 from B-D Facing South (800x600).jpg Excavation at Rahway Ave. View from the 3rd Floor (800x600).jpg Installed electrical conduit at the Sprinklers Room (152A) Facing South (800x600).jpg
Previous pageNext page Installing the underground Tele-Data piping at Rahway Ave. Facing South side of the Court Building (800x600)
Installing the underground Tele-Data piping at Rahway Ave. Facing South side of the Court Building (800x600)